PRARANCANGAN PABRIK ASETON, BUTANOL DAN ETANOL DARI MOLASE DENGAN KAPASITAS BAHAN BAKU 18.100 TON/TAHUN

Dublin Core

Title

PRARANCANGAN PABRIK ASETON, BUTANOL DAN ETANOL DARI MOLASE DENGAN KAPASITAS BAHAN BAKU 18.100 TON/TAHUN

Description

ABSTRACTThis preliminary ofAseton,Buthanol,and Ethanol (ABE) factory desain use molaseasa raw material with capacity of18.100 ton/year with effective working day 330day/year. The company form is Limited (Ltd) Corporation with structure line andstaff, andwhich has a total employee of 163 people. The factory location was plannedin Glungku sub district, Bireuenwith an area about 106.400 m2. Water sources ofthis factory is obtained from Peusangan river in Bireuen and the electricitysuppliedby National Electricty Power Company and thegenerator with power of6.661 Kw.From economic analysis was obtained :a. Fixed Capital Investment = Rp. 164.994.936.022b. Working Capital Investment = Rp. 32.417.336.920c. Total Capital Investment = Rp. 232.052.822.942d. Total Production Cost = Rp. 373.988.994.758e. Sales Prices = Rp. 539.868.750.000f. Profit = Rp. 165.879.755.242g. Pay Out Time (POT) = 4.7 tahunh. Break even Point (BEP) = 38.3 %i. Internal Rate Of Return (IRR) = 13,6 %
Banda Aceh

Creator

Reza Dwiki Prasetia

Publisher

Fakultas Teknik

Date

2014

Identifier

http://etd.unsyiah.ac.id//index.php?p=show_detail&id=7231