Browse Items (15590 total)

Nurse scheduling problem is one of the most difficult scheduling problems to solve since its solution space is large and it expects to comply many constraints. There is no standard model or a method of solution for nurse scheduling. The main…

A herpetofaunal survey was carried out in Temengor Forest Reserve, Peninsular Malaysia during the second Temengor Scientific Expedition conducted from 1st to 10th October 2012. This study represents the first records of amphibians and reptiles of…

AFRIZAL FAZIL. 1005106020014. Anaerobik Co-digesi Limbah Cair Sapi Dengan Ampas Tebu Menggunakan Reaktor Semi Kontinu Untuk Produksi Biogas. Di Bawah Bimbingan Darwin, S.TP, M.Sc Sebagai Pembimbing Utama dan Rahmat Fadhil, S.TP, M.Sc. Sebagai…

MUHAMMAD ILHAM. 1005106010075. Anaerobik Co-Digesi Limbah Cair Sapi Dengan Kulit Kakao Menggunakan Reaktor Semi-Kontinu Untuk Produksi Biogas. Dibawah bimbingan Darwin, S.TP., M.Sc sebagai Pembimbing Utama dan Hendri Syah, S.TP., M.Si sebagai…

Anak Gajah di Aceh Mati.pdf
Tim dokter gabungan BKSDA dan Fakultas Kedokteran Hewan Universitas Syiah Kuala melakukan perawatan intensif terhadap anak gajah

This study aimed to verify the effect of relative humidity during incubation ofduck eggs in the incubator on the rate of decline in egg weight, hatching day old duck weight, length and hatching eggs energy difference duck. Duck eggs taken from…
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2