Abstract: The generalized linear model-poison distribution was employed incorporating available geometric data, exposure, etc. The explanotary variables used were average annual daily traffic (AADT), length of segment, heavy vehicle percentage,…
Abstract: This research deals with the application of artificial grass planted on the channel banks influences to the Manning roughness coefficient (n). The information is useful in vegetative channel flow design, because the grass will stabilize the…
Abstract: Objective of this study to predict the flexural behavior of channel profiles (C) Ferosemen by using Artificial Neural Network (ANN). In modeling the effect of different variables is high-profile, number of layers wiremesh, and the amount of…
Abstract: Keuramat village of Kuta Alam sub-district is one of area in Banda Aceh City that still often occur puddle flood due to rainfall although its urban drainage had been rehabbed. The results of this study show that performance of the urban…
Abstract: Government regulation of Banda Aceh city the Urban Spatial Planning year 2009-2029 in which the site T.Umar road is earmarked for trade and services regional. T.Umar road area is the center of the Banda Aceh urban which have the heavy…
Abstract: The objective of this study is to see the effect of crack which is mention with the stiffness modification factor either for flexural stiffeness or torsion stiffener on behalf of section area, flexural moment, torsion moment, and shear…
Abstract: BPKP intersection is located in Banda Aceh City. This intersection was modified from three approaches between T.P. Nyak Makam Street and T. Iskandar Street, to be four approaches intersection. The new approaches is connected T.P. Nyak…
Abstract: Contractors need to understand the components and factors that can affect the cost of field overhead in accordance with the type of construction work to be carried out. Ccontractors perceiption will influence in determining the appropriate…
Abstract: There are three type of construction contract in Indonesia: lumpsum, unit price and mixed contract. Each type have different cost risk allocation for contractor. The research was conducted to compare the cost risk of the three tipes of…
Abstract: The article describes about the failure story of dam due to lack of stability. Carsington Dam in Derbyshire UK had been chosen as case study for this paper. The data obtain in the analysis was a part of postgraduate study project of the…